We are pleased to announce the release of Smart Construction Dashboard periodic update with the following dates and details.
No | Type | Function | Description |
1 | New feature | Data layer |
The following features are now available for non-Japan users |
2 | Enhancement | Setting |
When changing the coordinate system of a project, the history of coordinate system managed commonly is now displayed. |
3 | Enhancement | PDF report |
Stockpile totals can now be tabulated and shown in the PDF report. |
4 | Enhancement | Data layer |
Changed the initial gradient of the “Progress heat map” *Applicable from new project sites project sites. |
5 | Bug fix | Measurement |
When calculating Progress by creating annotations from the target design, the results of soil volume calculations were sometimes output slightly larger. This has been corrected so that the correct calculation results are now output. |
6 | Bug fix | Data layer |
When registering a 5-digit CSV or Txt file, the data could not be read correctly. This has been corrected so that the data can be imported properly. |
7 | Bug fix | Measurement |
The soil volume settings for Cut & Fill calculation could not be saved correctly. This problem has been corrected and the settings can now be saved properly. |
Details of release items
1. Progress heat maps can now be displayed by “Elevation Gap”
<Description> When displaying a heat map of project progress, user can now display heat maps by “Elevation Gap”. By expressing the heat map in terms of distance from the target design, user can grasp the progress at a glance.
At release, the thresholds are default only, but will be further enhanced in the future.
3.Changed the initial gradient of the “Progress heat map”
*Applicable from new project sites project sites.