Daigo

  • Total activity 143
  • Last activity
  • Member since
  • Following 0 users
  • Followed by 0 users
  • Votes 0
  • Subscriptions 92

Articles

Recent activity by Daigo Recent activity Votes
  • 2024/10/22 release note

    We are pleased to announce the release of Smart Construction Dashboard periodic update with the following dates and details.   No Type Function Description 1 Enhancement Machines A link to the...

  • What is Smart Construction Dashboard?

    Introduction This article provides a detailed explanation on the ERATHBRAIN Smart Construction Dashboard.This will give you an overview of the product so that you will be able to use it smoothly in...

  • How to check the difference in elevation between points.

    Introduction This article provides a detailed explanation on how to check the difference in elevation between points placed on terrain data. Procedures and Explanation 1. Click on the 【"1"measur...

  • Not reflected report file name during report output.

    Issue When outputting a PDF report from the report function, the set report file name is not reflected.   Answer The【"1" Report name】 is originally the name used when the file is generated, but by ...

  • Action Guide

    0.Introduction Getting Started    What is Smart Construction Dashboard? 1. Data settings and management Project Creation   How to create a new project Registration    How to register and set up sur...

  • 2024/10/2 release note

    We are pleased to announce the release of Smart Construction Dashboard periodic update with the following dates and details. No Type Function Description 1 Enhancement (additional function) PD...

  • How to register and set up survey data

    Introduction This article provides a detailed explanation on how to register and set up survey data. By registering the survey data as the pre-construction topography (reference topography) and inp...

  • 2024/09/11 Release note

    We are pleased to announce the release of Smart Construction Dashboard periodic update with the following dates and details.   No Type Function Description 1 Enhancement Measurement When measu...

  • How to register and set up design data

    Introduction This article provides a detailed explanation on how to register and set up design data (target design surface). By registering the survey data as the pre-construction topography (refer...

  • How to upload and set linework

    Introduction By uploading the linework and overlaying it with the design data, it can be utilized to plan the next construction steps.   Procedures and Explanation 1.  Click ”Add data layer”. 2. U...