How to measure the construction progress rate of a selected area.
Introduction This article provides a detailed explanation on how to measure the latest construction progress. By comparing the base topography, current topography, and target shape, it is possible ...
-
Release note January-March 2024
We are pleased to announce the release of the Smart Construction Dashboard periodic update with the following dates and details.2024/02/09 No Type Function Description 1 Improvement Measurem...
-
How to calculate the soil volume using the selected area as the reference plane.
Introduction This article provides a detailed explanation on how to set up the calculation of soil volume using a selected area as the reference plane.The selected area can be used as the reference...
-
Release note October-December 2023
We are pleased to announce the release of the Smart Construction Dashboard periodic update with the following dates and details.Tuesday, October 3, 2023 No Type Function Description 1 Enhancem...
-
How to calculate the elevation value that makes the amount of cut and fill ±0 in the selected range.
Introduction This article provides a detailed explanation on how to set up the calculation of elevation values that result in a cut-and-fill soil volume of ±0 within a selected range.Calculating th...
-
Release note July-September 2023
We are pleased to announce the release of the Smart Construction Dashboard periodic update with the following dates and details.Thursday, July 11, 2023 No. content Target function over view ...
-
How to manage soil volume for selected areas at once.
Introduction This article provides a detailed explanation on how to set up a batch soil volume control for a selected area.Using the work area in the measurement function, you can check the soil vo...
-
Release note April-June 2023
We are pleased to announce the release of the Smart Construction Dashboard periodic update with the following dates and details. Tuesday, April 4, 2023 No. content Target function over view 1...
-
How to measure the area of a selected range
Introduction This article provides a detailed explanation on how to measure the area of a selected area. The area calculation function can be used to measure "Surface area" or "Horizontal area," de...
-
How to import measurement data as "pre-construction survey"
If you have registered the data as "pre-construction survey": click on "Progress Management" in the under panel, click on "Add Data Layer", click on the radio button "Pre-Construction Topography(B...