Introduction
This article provides a detailed explanation on how to change the priority of as-built data based on the type of ICT construction equipment.
At a site where 3DMG machines and Komatsu ICT machines are mixed, the priority of data acquisition can be changed according to the type of construction work.
Procedures and Explanation
1. Click on 【"1" Settings icon】 in the side panel.
2. Select 【"2" Edit】 under "Data".
By changing the 【"1" As Built Targets】, the priority of the construction history data acquired in the conflicting range will be changed.
*By default, "ICT Machines" is given priority.
Supplementation
The As Built data acquisition mechanism is as follows.
Case 1: If the same area is constructed on the same day, the construction history data passed by Komatsu ICT basically takes priority.
Case 2: 3DMG construction history data will be given priority.
*If the construction history of other construction machine is manually uploaded, the ICT construction history data will be included in the calculation based on the upload time.