How to use Advanced Settings in survey data
Introduction This article provides a detailed explanation on how to adjust data in the application according to survey data information. By using each optional feature when importing survey data, i...
-
【Smart Construction Dashboard】2024/06/11 release note
We are pleased to announce the release of Smart Construction Dashboard periodic update with the following dates and details. No Type Function Description 1 New Data layer The display after pr...
-
How to group and manage created annotations
Introduction This article provides a detailed explanation on how to group and manage the annotations you've created. As construction management progresses, there will be many management annotations...
-
【Smart Construction Dashboard】2024/05/24 release note
We are pleased to announce the release of Smart Construction Dashboard periodic update with the following dates and details. No Type Function Description 1 New PDF Report When creating PDF ...
-
How to change the time zone for acquisition of As Built data
Introduction This article provides a detailed explanation on how to change the retrieval time of as-built data. If the machine has a data synchronization time set, the synchronization time of the a...
-
How to check the soil volume for the entire construction area
Introduction This article provides a detailed explanation on how to set for ascertaining the soil volume for the entire construction area.By registering the survey data as the pre-construction terr...
-
Release note April-June 2024 volume2.
We are pleased to announce the release of Smart Construction Dashboard periodic update with the following dates and details 2024/5/24 No Type Function Description 1 New PDF Report When creati...
-
How to measure the cut and fill volume in a selected area.
Introduction This article provides a detailed explanation on how to measure the cut and fill volume in a selected area. By comparing the reference topography data with the target shape, it is possi...
-
Release note April-June 2024 volume1.
2024/4/2We are pleased to announce the release of the Smart Construction Dashboard periodic update with the following dates and details. No Type Function Description 1 New Feature Data la...
-
How to measure the construction progress rate of a selected area.
Introduction This article provides a detailed explanation on how to measure the latest construction progress. By comparing the base topography, current topography, and target shape, it is possible ...