FAQ
- Creating a jobsite in Propeller
- How to transfer a project?
- DTM is elevated when using JXL for localization
- How can I properly place checkpoints and ground control points?
- Common Aeropoints (AP) Issues
- How To: Contour DXF Export function
- How to merge multiple surveys
- Do You Recommend using the DJI Mavic 3T?
- Trying to upload the GC3 and it keeps showing failed to update project
- Are there any recommended parameters if you want to continue using APv1?
- How to Import Propeller data into Dashboard
- How do I use Filtering setting?
- Due to the large survey area, is it possible to combine multiple flights?
- Supported Drone and Setting
- What are the Validation results for each step?
- PPK base station observation period verification fails.
- How do I place Ground control point(GCP)/Checkpoint(CHP) markers?
- What is the maximum size of the jobsite that Smart Construction Dashboard can process?
- Why do I get low PPK fix rate?
- I get an error on PPK processing
- 【Process drone data】 What files do I need to upload for PPK processing?
- 【Process drone data】 Ground control point(GCP)/Checkpoint(CHP) location is not displayed correctly
- How can I upload Ground control point(GCP)/Checkpoint(CHP) files?
- Dashboard Project and Komatsu IMC/3DMG Setup for Asbuilt Data
- Add specific employees to a specific project from MyKomatsu
- Shutter Priority Mode
- Drone Not Flying Mission - Connects to Another Controller
- As-Built Data
- Use CRS for data coming directly from or manually uploaded to Propeller
- How to create .gc3 localization file using Top-con Magnet Field software