No, construction results cannot be obtained after the design data is changed in Smart Construction Dashboard.
-
- The reason is that the target design surface (target shape) has not been set in Smart Construction Dashboard.
Please Note: even when the design data in Smart Construction Dashboard is changed but the target design surface (target shape) is not set, construction results cannot be obtained even if ICT construction machine or Retrofit machine is used to construct the area. (See the figure below).
Tip *If you have uploaded multiple design data, it is a good idea to merge them into one.
Comments
0 comments
Please sign in to leave a comment.