Introduction
By uploading the linework and overlaying it with the design data, it can be utilized to plan the next construction steps.
Procedures and Explanation
1. Click ”Add data layer”.
2. Upload linework files by drag & drop or from a local folder.
3. Select "Linework" and follow the prompts to finish upload.
4. Under 'Designs', click the 3 dots on the right.
5. Check "Clamp to surface".
*You can toggle the linework to be displayed by clicking the eye icon.
Ex: Display - only survey data Ex: Display - survey & linework data
** If the survey data display is off, the view will be displayed in the order of priority between the ortho data and base map.
- When ortho data display is on, ortho data takes priority over the base map and the plan view is displayed.
*Design data by itself is not included.
Ex: Display -Ortho only Ex: Display - base map only