We are pleased to announce the release of the Smart Construction Dashboard periodic update with the following dates and details.
No | Type | Function | Description |
1 | New | Measurement | A new line measurement , “Vertical difference,” has been added. The height difference of each vertex of a line can now be measured and displayed on the screen. |
2 | Bug fix | Measurement | When displaying heatmaps of progress and measurements, the heatmaps were sometimes displayed slightly off target. This has been corrected so that they are displayed correctly. |
3 | Bug fix | Measurement | In the color gradation settings for measurements, colors on the heatmap were not displayed properly when presets of gradation were used. This has been corrected so that they are displayed correctly. |
4 | Bug fix | PDF report | When the initial camera position of a project was updated, the updated camera position was not reflected in the PDF report. Fixed so that the report is created with the updated camera position. |
5 | Others | Label |
The following label updates in product have been made. -The expression of progress rate was changed to %. |
6 | New | Data layer | JXL format is now available when using localization in project settings. |
7 | Bug fix | Help |
[EU Customers Only] |
8 | Bug fix | Data layer (Survey Edit) | When deleting unnecessary objects by "Survey edit", a problem in which structures such as bridges over rivers could not be removed along the ground surface has been corrected. |
9 | New | Project Files | Smart Construction Groupware launch for North American Customers. |
Details of release items
1. “Vertical Difference” measurement newly added to line annotation.
<Description>
It is now possible to calculate the vertical difference of each vertex of a line annotation.
1)Create a line annotation and measure the “Vertical difference”.
2)The height difference at each vertex is shown graphically.
6. JXL format is now available as localization file
<Description>
JXL format is now supported as a file format for localization, making it more convenient to use in integration with Trimble.
8. Added the ability to add a Bleak line to the unwanted object removal area in the Survey Edit function.
<Description>
Previously, the point cloud editing function for removing unwanted objects could only attach a plane to the area to be removed, making it impossible to remove a bridge over a valley. Now, a function to add a break line to the unwanted object removal area has been added, allowing the user to specify the removal area more flexibly.
Specifying a Break line in Survey Edit
After specifying the removal area, break lines can be added by holding down Shift and clicking on the screen.
Specified break lines
Once new object removal area has created and saved, the removal area will be divided along the break line and start processing of the point cloud retiling.
Terrain after completion of survey edit
After editing with break lines, the point cloud is staked along the slope!
Reference: Conventional point cloud editing.
Previously, it was only possible to attach planes over unwanted objects, so structures such as bridges could not be properly removed.
Comments
0 comments
Please sign in to leave a comment.