Kamari

  • Total activity 52
  • Last activity
  • Member since
  • Following 0 users
  • Followed by 0 users
  • Votes 0
  • Subscriptions 31

Articles

Recent activity by Kamari Recent activity Votes
  • How to transfer a project?

    This transfer is completed in a few easy steps through either My Komatsu or the Dashboard application. First, log in to https://smartconstruction.mykomatsu.komatsu/  and select “My subscription". 1...

  • DTM is elevated when using JXL for localization

    Sometimes when using a JXL file for localization, it can cause a shift in the data where we have to use Custom Site Projection for the survey. You can do this by performing a survey edit.  To start...

  • Common Aeropoints (AP) Issues

    Aeropoints (AP) issues are usually caused by a few things: No hotspot connection. Recommendation is to use the AP app on your phone and then connect to the AP and see when it transmits. The Aerop...

  • How To: Contour DXF Export function

    1. In the Measurements section, click the "Site" button.   2. Click "Add New Measurement", and from the drop-down list, click "Elevation".    3. Click "Calculate".   4. Click the eye icon to rev...

  • How to Import Propeller data into Dashboard

    1. Click ‘Add Data Layer’ and select ‘Propeller’. 2. Select the date of the data you want to import and click ‘Next’. 3. Select the type of data you want to import and click 'Import.' Please Not...

  • Dashboard Project and Komatsu IMC/3DMG Setup for Asbuilt Data

    Dashboard Setup Excavator Setup Bulldozer Setup   Please see below for screenshots for adding a machine to a project and/or assigning a project to the machine: Add the machine to the project ...

  • Shutter Priority Mode

    Motion blur is a common problem in aerial photogrammetry. It's typically due to a slower shutter speed while the craft is flying quickly. To avoid the motion blur effect, we can set the camera into...

  • As Built Data: Common Questions

    What happens to the as-built captured in the afternoon?- Captured within the prior 24 hours. Example below if you were to set the Daily Sync time to 11:30 am: If the sync time is 11:30a, user will...

  • How to create a new project

    Setting up a new project is the initial step when using the Smart Construction Dashboard. This process is essential for every job site. There are two ways to set up a project. Method #1 - Importing...

  • How to change the coordinate system

    If the wrong coordinate system was selected during registration, here's how to correct that: 1) Click the "Project settings"① in the left menu item. 2) Select "Coordinate system"➁.   3) Click "Conf...