0.Introduction
Getting Started
What is Smart Construction Dashboard?
1. Data settings and management
Project Creation
How to create a new project
Registration
How to register and set up survey data
How to register and set up design data
How to register top view floor plan data
How to register ortho image data
How to register as-built data manually
How to use the Process drone data
Change Setting
How to change the coordinate system(localization/projection)
How to add supplementary information to terrain data
How to use Advanced setting in survey data
How to group and manage created annotations
How to change the time zone for acquisition of As built data
How to change the priority of as-built data depending on the ICT model
2. Data utilization
Soil volume calculation
How to check the soil volume for the entire construction area
How to measure the cut and fill volume for the design
How to check the latest construction progress
How to measure the soil volume for selected area
How to measure the soil volume to flatten the terrain
How to manage the soil volume for transport efficiently
Measurement and annotation
How to measure the area of a selected range
How to measure the cross section of terrain data
How to measure distances on terrain data.
How to add instructions and descriptions to terrain data
How to check the difference in elevation between points
How to customize the annotation information
How to customize the measurement result
3.Related to ICT Construction Machine and Solution
Komatsu ICT machine
How to link automatically with the construction history data of ICT machine.
3D Machine Guidance
How to auto linkage 3GMG whit Smart Construction Dashboard
Solution Collaboration
How to auto register the survey data from Edge2
4.Support function
Support function
Comments
0 comments
Please sign in to leave a comment.